From the works you do not see… to the details you notice every day.
Finishing works vary with the type of space, the level of fit-out required and the condition of the building. We therefore define the items, materials and limits of the works according to the designs, the specifications and the contracted scope.
Plastering and surface preparation
Carrying out plastering and preparing walls, ceilings and surfaces to receive the subsequent finishes, according to the project’s requirements and the condition of the surfaces.
Floors and walls
Installing floors and wall cladding, including the types specified in the project documents, with attention to levels, joints and the execution details appropriate to each system.
Ceilings and internal partitions
Carrying out suspended ceilings, internal partitions and their associated elements, according to the approved designs and the required coordination with services and installations.
Painting and final finishes
Carrying out surface preparation, painting and final finishes, according to the agreed materials and finishing grades.
Electromechanical works related to finishing
Coordinating and carrying out the electrical, plumbing and mechanical installations and fittings that fall within the finishing scope, according to the approved technical documents and with the support of qualified specialists where needed.
Joinery, doors and fixed fittings
Carrying out, or supplying and installing, the doors, joinery and fixed fittings specified within the project scope, according to the approved specifications and measurements.
Note on the scope of service
Not every item listed is automatically included in every project. The scope of execution, supply and installation, the finishing level and the materials are defined by the agreement and the approved documents.
Your budget determines the options, not how much we care about your project.
We do not believe that the right finishing must always be tied to the most expensive materials or the largest budget. Every client has their own priorities, every space has its own requirements, and there is more than one way to reach a result that suits the use and the budget.
We discuss the scope of work and the available choices with you, and help you weigh the alternatives in terms of specifications, cost and usage requirements, while maintaining compliance with the essential technical requirements.
Options for different budgets
Whether you are looking for practical, economical finishing, a mid-range level, or high-specification finishes, we discuss the possible options according to your budget and your project’s requirements.
Priorities before extras
We help you distinguish between the essential works and the choices that can be adjusted, so that you can direct your budget to the items that matter most to you.
Clarity on what the cost includes
We take care to define the materials, the items and the supply and execution responsibilities within the agreement, so that you can compare the options on a clear basis.
Note
This does not mean a commitment to carry out any scope of work for any amount; the options are subject to the technical requirements, the actual cost, feasibility and the agreement between both parties.
You do not have to finish the whole place to start with us.
You may need a complete apartment finished, or what is needed may simply be renovating a bathroom, fitting out a kitchen, laying floors, painting, installing suspended ceilings, or completing works that stopped at an earlier stage.
At Southern Castle, we can discuss carrying out partial works or standalone items, without requiring the contract to cover the entire unit or building.
Examples of partial works:
- Finishing or renovating a room or part of the unit.
- Carrying out bathroom or kitchen works.
- Installing floors or wall cladding.
- Carrying out plastering or painting.
- Installing suspended ceilings or internal partitions.
- Completing finishing items not yet carried out.
Whether what is needed is an integrated project or a single item, we start by understanding what you need carried out.
Technical note
Partial works are reviewed according to their condition and the requirements for connecting them with the existing works, and their feasibility and scope are determined after discussing the technical and practical details.
Good finishing does not only catch the eye… it makes the place easier to use.
A client may be drawn to a colour, a material or an architectural detail, but the success of the finishing also depends on how well the choices suit the type of use and the maintenance and execution requirements.
Materials suited to the use
The requirements for floors, walls and surfaces differ between a home, an office and a shop. We therefore take care to discuss the specifications suited to the intended use, within the limits of our execution and coordination role.
Coordination before works are closed up
The positions of installations and of electrical, drainage and air-conditioning points may affect the ceilings, walls and final fittings. This is why the sequence of works needs prior coordination between the disciplines.
Attention to execution details
Levels, junctions between materials, edges, joints and the positions of fixtures may appear to be small details, but they affect the final result and the way the space is used.
Clarity on choices and changes
Some choices may change during execution. We therefore take care to clarify the agreed items and materials, and to discuss the effects of any changes before they are approved and carried out.
Every choice has its place… and every stage has its timing.
Finishing works require coordination between successive works, suppliers and different disciplines. We therefore make sure the requirements and the sequence of execution are clear, and that items are reviewed at the appropriate stages.
Understanding the space and its requirements
We discuss the type of use, the finishing level required and the available budget, and review the drawings, specifications and available information on the condition of the site.
Defining the items and materials
We set out the scope of work, the supply and installation requirements, and the materials and finishes required, discuss suitable alternatives and identify what needs to be selected or approved before execution.
Organising the stages of work
We coordinate the sequence of works and the disciplines and resources within our scope, taking into account the site requirements and the agreed programme.
Execution and review
We carry out the works according to the approved documents and choices, and follow up on the coordination points and observations that arise during execution.
Completion and handover
We work to complete the contracted items, review the observations related to them, and organise the handover procedures according to the agreement.
Because the space you live in is different from the space you run your business from.
We take into account the differences in the type of use and the execution requirements between residential, commercial and administrative spaces, whether what is needed is integrated finishing or specific partial works.
Apartments and villas
Carrying out finishing and interior fit-out works for residential spaces, whether new units or as part of completion and finishing projects, at levels that suit different requirements and budgets.
Offices and administrative spaces
Carrying out the finishes, partitions and fittings associated with office and administrative spaces, according to the usage requirements and the approved documents.
Shops and commercial spaces
Carrying out finishing and fit-out works for shops and commercial spaces, taking into account the requirements of the activity and the defined scope of work.
Real-estate projects and specialised contracting
Carrying out finishing packages or specific stages within larger projects, in coordination with developers or main contractors under clear contractual arrangements.